Important note
This article is general information current as of September 2026, not legal, engineering, or financial advice. Retrofit ordinance requirements, deadlines, grant program availability, and cost recovery rules change and should be confirmed directly with LADBS, LAHD, CRMP, or a licensed structural engineer before making decisions. Max Berger is a licensed real estate professional, not an engineer, contractor, or attorney, and this article does not constitute engineering, legal, or financial advice.
For most Los Angeles soft-story buildings, "deadline" is the wrong word. The City's mandatory retrofit program, Ordinance 183893, gave owners 7 years from their Order to Comply to finish construction, and since those orders went out in phases between 2016 and 2017, most 7-year deadlines already passed in 2023 or 2024. If your building hasn't been retrofitted, you're not facing an upcoming date; you're already out of compliance, and that status follows the building into escrow. There's also a genuinely time-sensitive piece here: a state grant covering up to $49,600 per building closes registration on September 30, 2026.
Most LA apartment owners know they’ve received something from the city about seismic retrofitting at some point: a letter, an inspection notice, a mention from a broker or property manager. Far fewer know exactly where that obligation stands today, or that “compliance deadline” for most soft-story buildings isn’t a date on the horizon anymore; it’s one that’s already passed.
That gap between what an owner assumes and what the city’s records actually show is exactly the kind of thing that surfaces at the worst possible time: mid-escrow, when a buyer’s lender asks for documentation nobody thought to pull together. This matters everywhere in the city, but it’s especially common in older Eastside stock like Boyle Heights, where pre-1978 wood-frame buildings with ground-floor parking are common.
Table of Contents
ToggleBefore you list a soft-story building, knowing exactly where it stands on this timeline changes how you price it, who you can sell it to, and how fast you can close.

Step 1: Confirm Whether Your Building Is Actually in Scope
The ordinance applies to a specific, narrow set of buildings, and owners sometimes assume they’re covered when they’re not, or vice versa. Under LADBS’s Soft-Story Retrofit Program, a building qualifies when it is wood-frame construction of two or more stories, was built under codes in effect before January 1, 1978, has ground-floor parking or other open space at street level, and has more than three dwelling units. The City identified roughly 13,500 buildings citywide that meet this description.
If your building meets all four criteria, the obligation exists whether or not you’ve personally received the paperwork, and it stays with the property through a sale; it doesn’t reset when ownership changes.
Step 2: Find Out Where Your Building Stands on the Clock
The compliance clock starts the day the City serves the Order to Comply, not when the ordinance passed. From that date, owners have three checkpoints: 2 years to submit either proof of a prior retrofit, structural plans, or demolition plans; 3.5 years to obtain the actual building permit; and 7 years to complete construction or demolition. Orders went out in priority waves, Priority I for buildings with 16 or more units, Priority II for buildings of three or more stories with fewer units, largely between May 2016 and November 2017.
Run that math forward, and most 7-year completion deadlines landed in 2023 or 2024. If your building’s Order predates 2019 and construction isn’t finished, you’re not early; you’re overdue.
Non-ductile concrete buildings run on a separate, longer timeline under LADBS’s companion program, roughly 1,500 buildings citywide, with 3 years to submit an identification checklist and 10 years to submit retrofit or demolition plans, stretching toward a total compliance window commonly cited around 25 years given the scale of concrete retrofit work. Most small and mid-size LA apartment buildings fall under the wood-frame soft-story program rather than this one.
Step 3: Understand What Non-Compliance Actually Does to a Sale
A building that’s past its deadline doesn’t just carry construction risk; it carries transaction risk. Continued non-compliance can trigger escalating LADBS fines, and unpaid fines can be recorded as liens against the property, which shows up in a title search and complicates both financing and closing.
Buyers, and especially their lenders, increasingly ask for retrofit status before removing contingencies, and an unresolved Order to Comply is the kind of thing that gets discovered during due diligence, whether or not it was disclosed upfront. Pricing a non-compliant building as if the retrofit isn’t a real cost to the next owner is one of the more common mistakes sellers make.
Step 4: Know How Retrofit Costs Interact With Rent-Stabilized Units
If your building is covered by the City’s Rent Stabilization Ordinance, retrofit spending doesn’t have to sit entirely on the ownership side. Under LAHD’s Seismic Retrofit Work Cost Recovery Program, an owner can pass through up to 50% of the total retrofit cost to tenants as a temporary rent surcharge, capped at $38 per unit per month for 120 months, extendable if the full approved amount hasn’t been recovered yet.
This requires LAHD approval and proper tenant notice under the Tenant Habitability Plan process; it isn’t automatic. For buildings outside the City’s RSO, check the applicable rules for that jurisdiction in our guide to rent control across LA County before assuming the same 50% figure applies.
Talk to Max About Selling a Soft-Story Building
Retrofit status changes who your buyer pool looks like and how a deal gets structured. Let Max help you sell your LA apartment building with retrofit status factored into pricing from the start, not discovered mid-escrow.
Step 5: Check This Grant Before It Closes on September 30
This is the piece most retrofit content misses entirely, and the timing genuinely matters right now. The $3,000 grant most owners have heard about, Earthquake Brace + Bolt, is for single-family homes with cripple-wall foundations, not multi-unit soft-story apartment buildings.
The relevant program for apartment owners is different: the Earthquake Multi-Unit Retrofit (EMR) grant, administered by the California Residential Mitigation Program, a joint powers authority of the California Earthquake Authority and Cal OES.
| EMR Grant Component | Coverage |
| Engineering and permit fees | 70% of cost, up to $7,000 |
| Retrofit construction cost | 70% of cost, up to $4,260 per unit |
| Maximum total grant | Up to $49,600 per building |
To qualify, the building needs 5 to 10 units, wood-frame construction built before 1991, a documented soft-story deficiency, and an existing Order to Comply from a participating city; Los Angeles is explicitly on that list. Registration opened August 19, 2026, and closes September 30, 2026. If your building fits that unit range and you haven’t registered, this window is closing fast.
Step 6: Get Your Documentation Ready Before You List
For a fuller walkthrough of the retrofit process itself, from engineering assessment through final sign-off, see our soft-story retrofit guide for LA apartment buildings. Once construction is complete, LADBS issues a Certificate of Compliance, the document a buyer’s attorney or lender will actually want to see, not a verbal assurance that the work was done.
Before listing, pull together the Order to Comply, any structural plans and permits filed with LADBS, the Certificate of Compliance if the work is finished, and, if you used the LAHD cost recovery program, the approved surcharge documentation. Buildings with a clean, complete paper trail move through escrow faster and attract a wider pool of institutional and lender-financed buyers than buildings where the status has to be reconstructed after an offer is already in hand.
Working Through This With Someone Who Tracks the Deadlines
Retrofit compliance touches structural engineering, LADBS permitting, LAHD cost recovery, and now a closing grant window, all before a building ever gets to market. Max Berger has spent over a decade helping Los Angeles apartment owners understand exactly where their building stands before they price it or list it.
If you own a soft-story building and want a clear read on how its retrofit status affects value and marketability, book a call to talk it through.
Get a Free Valuation That Accounts for Retrofit Status
A building’s retrofit status affects its value and its buyer pool. Request a free, no-obligation valuation that factors in where your building actually stands.
Frequently Asked Questions
Yes. LADBS requires plan review, permitted construction, and a final inspection before issuing a Certificate of Compliance for a soft-story or non-ductile concrete retrofit. A retrofit isn't considered complete for ordinance purposes until it passes that final inspection.
It's structural reinforcement, typically steel moment frames or plywood shear walls, added to the weak ground floor of an older wood-frame building, usually where open parking or large ground-floor openings reduce the building's ability to resist lateral earthquake forces. The goal is to prevent the kind of ground-floor collapse that has caused fatal building failures in past California earthquakes.
Yes, but that specific $3,000 figure refers to the Earthquake Brace + Bolt program, which covers single-family homes and small 1-4 unit buildings with cripple-wall foundations, not the larger soft-story apartment buildings covered by LA's mandatory ordinance. Owners of 5-10 unit soft-story apartment buildings should look at the separate Earthquake Multi-Unit Retrofit grant instead, worth up to $49,600.
A building, typically multi-story and wood-frame, where the ground floor is significantly weaker or more open than the floors above it, commonly because of tuck-under parking, large windows, or commercial-style openings that replace the shear walls a stronger design would have at street level.